We've made lots of progress on the second floor and could have nearly all the rooms (with the exception of the bathroom) decorated by summer. Then it's time to move on to the first floor.
Here's how I'm predicting the order of completion:
1. Kids' Bathroom
• Organize closet/under the sink
• Replace faucet
• Hang hooks
• Hang photos, artwork
• Repaint step stool (optional)
2. Kid's Bedroom
• Organize art supplies
• Buy desk and desk chair
3. Nursery
√ Organize closet
• Make and hang tree artwork
√ Hang ledge and all framed artwork
• Buy side table/table lamp
4. Master Bedroom
• Hem drapes
• Buy√ and hang pullbacks
• Buy box for bedside
• Paint (upholster?) bench
• Buy and mount tv
• Buy side table
√ Second photo to flank window
• Replace ceiling fan
• Buy gold leaf artwork
• Silver leaf frame
• Buy king size mattress
• Buy headboard
• Reupholster armchair
• Buy hang display cube
• Paint walls?
5. Master Bathroom/Closet (simple fixes)
• Paint or Hang wallpaper in closet
• New light fixture for closet
• Paint cabinetry / new pulls
• Buy/hang medicine cabinets
• New window treatment
• Organize closet